کاربر30148
رتبه : 546568
مهارتها
گزارش عملکرد:
SADEGH FAKHR REIHANIZADEH
Personal Information :
§ MARITAL STATUS : MALE - MARRIED
§ NATIONALITY: IRANIAN
§ AGE: 40
§ PLACE OF BIRTH : TEHRAN
§ WORK EXPERIENCE : 14 YEARS
Objective :
ELECTRICAL ENGINEER
Education :
1998 – B.S IN ELECTRICAL ENGINEERING (POWER) – TEHRAN ISLAMIC AZAD UNIVERSITY
Interests , courses and activities :
1. FAMILIARE WITH ELECTRICAL STANDARDS INCLUDE OF : IEEE, BS , IEC , VDE , NFPA )
2. PASS ONE COURSE IN 9001
3. COMPUTER'S GENERAL SOFTWARE INCLUDE OF : OFFICE , AUTO CAD , INTERNET, MATLAB , MSP , PRIMAVERA AND ENGINEERING SOFTWARES INCLUDING : E – TAP , DIALUX , E – PLAN , DIG SILENT , AND OTHERS.
4. RESEARCH ABOUT SUPERCONDUCTIVITY
5. ARTICLES :
- SUPERCONDUCTIVITY AND APPLICATIONS
- FUTURE POWER CABLES
- SUPERCONDUCTIVITY CABLES
- SUPERCONDUCTIVITY GENERATORS
6. E-TAP SOFTWARE COURSE ON NOVINE PARSIANE CO.
7.MV-LV PLANNING AND DESIGNING COURSE ON NOVINE PARSIANE CO.
Languages:
PERSIAN , ENGLISH , TURKISH AND ARABIC
Work Experience:
1. 2012 UP TO NOW PARS ENERGY KASRA CO ABOUTE OIL ,GAS AND PETROLIUM PROJECTS
- PREPARATION BASIC AND DETAIL DESIGN DOCUMENT ON PROJECTS .
- PREPARATION ON TENDER DOCUMENT ABOUT PROCUREMENT AND CONSTRACTION ON PROJECT
- PORCUREMENT AND CONSTRUCTION ON THE OIL AND GAS PROJECTS .
2. 2011 UP TO 2012 PETROAZAR PAD CONSULTING ENGINEERS CO ABOUTE OIL ,GAS AND PETROLIUM PROJECTS
- TO DETAIL DESIGN AND PREPARE AND ANALYSIS DOCUMENT RELATIVE OIL .GAS , GAS AND PETROLIUM AND PROJECTS SUMAR AND ASMARY.
- TO PREPARING DOCUMENTS RELATIVE TO TENDER DOCUMENT .
- PREPARING AND DESIGN AND PLANNING OF ALL ELECTRICAL DOCUMENT CONSISTING SPECIFICATION DOCUMEN, DESCRIPTION, SINGLE LINE AND ONE LINE DIAGRAMS ,CALCULATION. DATA SHEET. , OPERATION AND COMMISIONING, AND … - (WITH ANALYSIS SOFTWARES)
3. 2009 UP TO 2011 BINA CONSULTING ENGINEERS CO ABOUTE OIL ,GAS AND PETROLIUM PROJECTS
- PSL ON ELECTRICAL AND COMMUNICATION DEPARTMENT
- TO DETAIL DESIGN AND PREPARE AND ANALYSIS DOCUMENT RELATIVE OIL .GAS , GAS AND PETROLIUM AND INDUSTRIAL PROJECTS .
- TO PREPARING DOCUMENTS RELATIVE TO TENDER DOCUMENT .
- PREPARING AND DESIGN AND PLANNING OF ALL ELECTRICAL DOCUMENT CONSISTING SPECIFICATION DOCUMEN, DESCRIPTION, SINGLE LINE AND ONE LINE DIAGRAMS ,CALCULATION. DATA SHEET. , OPERATION AND COMMISIONING, AND … - (WITH ANALYSIS SOFTWARES)
4. OCTOBER 2007 UP TO 2009 PAYANDAN / SHANUL FARAYAND CO ABOUTE OIL ,GAS AND PETROLIUM PROJECTS
- TO DETAIL DESIGN AND PREPARE AND ANALYSIS DOCUMENT RELATIVE OIL .GAS , GAS AND PETROLIUM AND INDUSTRIAL PROJECTS .
- TO PREPARING DOCUMENTS RELATIVE TO TENDER DOCUMENT .
- PREPARING AND DESIGN AND PLANNING OF ALL ELECTRICAL DOCUMENT CONSISTING SPECIFICATION DOCUMEN, DESCRIPTION, SINGLE LINE AND ONE LINE DIAGRAMS ,CALCULATION. DATA SHEET. , OPERATION AND COMMISIONING, AND … - (WITH ANALYSIS SOFTWARES)
5. SEP 2005 UP TO OCTOBER 2008 NUCLEAR OFOGH CONSULTING ENGINEERING (OCE)
- HEAD OF MV/LV UNIT ON ELECTRICAL DEPARTMENT .
- TO DESIGN AND PREPARE AND ANALYSIS DOCUMENT RELATIVE BUSHEHR NUCLEAR POWER PLANT .
- TO PREPARING SPECIFICATION DOCUMENTS RELATIVE TO TENDER DOCUMENT ON NPP .
- PREPARING AND DESIGN AND PLANNING OF ALL ELECTRICAL DOCUMENT CONSISTING SPECIFICATION DOCUMEN, DESCRIPTION, SINGLE LINE AND ONE LINE DIAGRAMS ,CALCULATION. DATA SHEET. , OPERATION AND COMMISIONING, AND … - (WITH ANALYSIS SOFTWARES) .
- TO PROVIDING TECHNICAL SPECIFICATION ABOUT TO NPP AS TENDER DOCUMENT. -
- TO PROVIDING TECHNICAL SPECIFICATION AND TENDER DOCUMENTAND CONTRACT DOCUMENT TO ENGLISH AND PERSIAN FOR NPP AND OTHER PROJECT AS TENDER DOCUMENT.
- DESIGN REVIEW OF ALL NUCLEAR POWER PLANT DOCUMENTAND ENGINEERING PROJECT ABOUT THAT
6 - AUGUST 2004 TO SEP 2005 MAPNA AND PARS GENERATOR CO.
- ENGINEERING OFFICE EXPERT FOR DESIGN, DESIGN REVIEW AND ENGINEERING OPERATION CONSIST OF THE BELOW POINTS: (ON 3000 MW PROJECT GAS TURBINE) .
* LIGHTING SYSTEM.
* LIGHTNING SYSTEM.
* EARTING SYSTEM.
* PROTECTION SYSTEM CONSISTS OF TRANSFORMER & GENERATOR & BUS BAR & CIRCUIT BREAKER PROTECTION.
* TRANSFORMER SYSTEM.
* GENERATOR AND TURBINE SYSTEM.
* EXCITATION SYSTEM.
* CABLING SYSTEM.
* BUS DUCT SYSTEM.
* MV, LV, CONTRL, AND MCC PAELS.
* DC AND UPS SYSTEM.
* SUBSTATION SYSTEM.
* COMMISSIONING SYSTEM.
MANUFACTURING, TEST, INSTALL AND COMMISIONING HYDRO & GAS POWER PLANT BUS DUCTS.
HYDRO & GAS & STEAM POWER PLANT GENERATORS.
( MANUFACTURING , TEST , INSTALL & COMMISSIONING )
7 – FEB 1999 TO AUGUST 2004 GHODS NIROO CNSULTING ENGINEERS CO.
- ENGINEERING AND PROJECT OFFICE EXPORT FOR DESIGN , DESIGN REVIEW , SUPPERVISORE AND ENGINEERING OPERATION FOR SPECIFICATION AND CALCULATION TEST DOCUMENT ON POWER PLANT AND TRANSMISSION LINE PROJECT CONSIST OF THE BELOW POINTS :
* EARTING SYSTEM AND TESTS.
* LIGHTING ARRESTER SYSTEM AND TESTS.
* INPUT AND OUTPUT LIGHTING SYSTEM AND TESTS.
* DESIGN AND CONTROL ON INSTALLATION AND DISTRIBUTION TRANSMISSION LINE 33KV.
* CABLING MV (10KV, 33KV) , LV , CONTROL AND PREPARING CABLE LIST AND TESTS OF MEGER AND HV AND OTHER TESTS .
* ERECTION OF POWER PLANT OUTDOOR POWERSTATION, PANELS AND SWITCHGEAR INSTRUMENT, LV PANELS, TRANSFORMERS (8MVA, 1MVA, 230MVA) AND TESTS.
* TEST OF TRANSFORMERS :
* RATIO TEST, MEGER TEST, DC RESISTANT TEST, TRANSFORMER OIL TEST.
* ERECTION OF CABLE STRUCTURES.
* I & C SYSTEM :
* FIRE ALARM SYSTEM.
* MONITORING SYSTEM
* PLC SYSTEM.
* CONTROL SYSTEM.
8– JUN. 1997 TO MAY. 1998 MEHRABAD INDUSTRIAL CO
- TECHNICAL OFFICE ENGINEER.
- DESIGN ON ELECTRICAL PANELS.
Professional memberships :
1. MEMBER OF IRAN ENGINEERING SYSTEM ORGANIZATION OF
BUILDING ORDER
2. MEMBER OF IRANIAN ASSOCIATION OF ELECTRICAL & ELECTRONIC ENGINEERS ( IAEEE )