از پارسکدرز بیشترین بهره را ببرید و رویای کاری خود را زندگی کنید.
سه ماه پیش منتشر شده
تعداد بازدید: 54
کد پروژه: 512265
شرح پروژه
سلام
یه پروژه داشتم
AHP
• Level I: Introduction:
In this study, the AHP was used to identify the weight of indexes to investigate the causes of delays in development projects and their effects on the execution of the PMO.
• Level II: Criteria:
This area includes measures that affect project management. In this study, a questionnaire was distributed to senior managers, experts in development companies, industry experts, and civil construction sectors to integrate all cases. The following criteria were agreed upon by all of them:
1. Side factors
2. Technical factors
3. Materials and machineries
4. Contractors and Employers
5. Health and safety factors
6. Time factors
7. Financial factors
• Level III: sub:
To select the third level of the hierarchy, with the integration and development of experts contracted companies the most influential factors identified in Analytic Hierarchy Chart.
1. The lateral sub-criteria:
• Social and cultural issues
• Rules and parallel institutions of government
• Change management and applications
• Administrative errors
• Low efficiency and expertise of human resources
• Problems with neighbors and area residents and pedestrians
2. The technical sub-criteria:
• Lack of executive plans
• Bugs design and computational volumes
• Select machines inappropriate
• Changes to Procedure
• Improper selection procedure
• Management workshop
3. The materials and machinery sub-criteria:
• Material changes due to operational requirements during the construction
• The availability of materials and delay in supply of materials
• The quality of low efficiency of machinery
• Failure inappropriate machinery and technology
• Equipment and machinery is not available and the lack of spare parts needed
4. The sub-criteria and contract the contractor and the employer:
• Organizations and groups of organizations involved in the project Relations
• Despite the flaws and ambiguities in contracts, project contracts
• Lack of experience and skills relevant stakeholders
• Bureaucracy in the system of employer-contractor contract
• Improper method of tendering and selection of contractors
• Employer interference and delay decisions
5. Health and safety sub-criteria:
• Natural disasters, floods, earthquakes and landslides buildings
• Work-related accidents due to building height
• Work-related accidents due to urban agglomeration
• Air pollution in dense urban areas
6. When sub-criteria:
• Long-time review and approve the proposal and maps
• The length of the administrative processes for tall buildings in dense areas
• The long duration of action due to congestion and traffic
• Delay in the delivery of materials and equipment and transport system
7. The financial sub-criteria:
• Lack of financing continues
• The cost of traffic management and pedestrian crossing
• Inflation and rising prices
Expert choice
عجله ای ندارم
خودم عددها و اولویت ها را به شما می دهم
من اینا را تو اکسل کشیدم
ولی تو نرم افزار میخوام
خیلی وقت نمی بره
من عکس بالا را خدمتتون برای هر کدام می دهم
عین همین گزارش را می خاهم
ممنون
این پروژه شامل 1 فایل مهم است، لطفا قبل از ارسال پیشنهاد حتما نسبت به بررسی این فایل اقدام فرمایید.
مهارت ها و تخصص های مورد نیاز
بودجه
100,000 تومان تا 300,000 تومان
مهلت برای انجام
7روز
وضعیت مناقصه
بسته
درباره کارفرما
عضویت دو سال پیش
قادر به انجام این پروژه هستید؟
مهلت ارسال پیشنهاد قیمت برای این پروژه تمام شده است
به رایگان یک حساب کاربری بسازید
مهارتها و تخصصهای خود را ثبت کنید، رزومه و نمونهکارهای خود را نشان دهید و سوابق کاری خود را شرح دهید.
به شیوهای که دوست دارید کار کنید
برای پروژههای دلخواه در زمان دلخواه پیشنهاد قیمت خود را ثبت کنید و به فرصتهای شغلی منحصر به فرد دسترسی پیدا کنید.
با اطمینان دستمزد دریافت کنید
از زمان شروع کار تا انتهای کار به امنیت مالی شما کمک خواهیم کرد. وجه پروژه را از ابتدای کار به امانت در سایت نگه خواهیم داشت تا تضمین شودکه بعد از تحویل کار دستمزد شما پرداخت خواهد شد.
میخواهید شروع به کار کنید؟
یک حساب کاربری بسازید
بهترین مشاغل فریلنسری را پیدا کنید
رشد شغلی شما به راحتی ایجاد یک حساب کاربری رایگان و یافتن کار (پروژه) متناسب با مهارتهای شما
است.
پیدا کردن کار (پروژه)
تماشای دمو روش کار